Payloads: Combustion Integrated Rack (CIR): Preparations were made to support a Fuel Oxidizer Management Assembly (FOMA) calibration. The FOMA calibration is performed periodically and helps to verify accurate readings from the various measurement systems in the CIR. The CIR facility includes an optics bench, combustion chamber, fuel, and oxidizer control, and five different cameras for … ...
January 17, 2023 at 11:00AM
From NASA: https://blogs.nasa.gov/stationreport/2023/01/17/iss-daily-summary-report-1-17-2023/
No comments:
Post a Comment