Friday, April 21, 2023

ISS Daily Summary Report – 4/20/2023

iss-about-banner

 

Payloads: CapiSorb Visible System (CVS): The CVS was primed with water and Red Syringe (fructose). Pump tubing was installed into the Liquid Pump rotor and the system performed experiment runs. The CVS investigation demonstrates a liquid control using capillary forces, over a range of liquid properties that are characteristic of liquid carbon dioxide sorbents. Since … ...

April 20, 2023 at 12:00PM
From NASA: https://blogs.nasa.gov/stationreport/2023/04/20/iss-daily-summary-report-4-20-2023/

No comments:

Post a Comment