Tuesday, March 8, 2022

ISS Daily Summary Report – 3/07/2022

iss-about-banner

 

Payloads: Cold Atom Lab (CAL): A visual inspection was performed of the CAL moderate temperature coolant jumper, and any coolant observed was cleaned up. A persistent very slow leak has been observed in this coolant line and the ground is discussing a forward plan, but science activities can be continued in this state. The CAL … ...

March 07, 2022 at 11:00AM
From NASA: https://blogs.nasa.gov/stationreport/2022/03/07/iss-daily-summary-report-3-07-2022/

1 comment:

  1. The device, in flip, is positioned and Duvet Covers guided by way of stepper or servo motors, which replicate exact movements as determined by the G-code. If the pressure and velocity are minimal, the process can be run by way of open-loop control. For every thing else, closed-loop control is critical to ensure the velocity, consistency and accuracy required for industrial applications, similar to metalwork. In the CNC machining process, a 2D or 3D CAD drawing is conceived, which is then translated to pc code for the CNC system to execute.

    ReplyDelete