![](http://www.nasa.gov/sites/default/files/thumbnails/image/ksc-20210612-ph-csh01_0108_orig.jpeg)
Teams with NASA’s Exploration Ground Systems and contractor Jacobs lower the Space Launch System (SLS) core stage – the largest part of the rocket – onto the mobile launcher.
from NASA http://www.nasa.gov/image-feature/artemis-i-space-launch-system-core-stage-lift-and-mate
via IFTTT
No comments:
Post a Comment